Checkpoints for shop floor management
Shop Floor Check Points:
Check all operators working in the shop should be as per Skill Matrix. Also check their skill level as per required level for the job.
2. Operation Standard :
Check that the OPS/WI should be available on each machine & easy to view, read & in local language ( Hindi,Marathi etc.)
3. Limit Samples:
Check that the Limit Sample should be available of each parts & also check expiry date of limit samples.
4. Set up Approval:
Check that set up approval done of each machine with sign,date & approval report. Also keep the sample on machine at defined location for the shift.
5. Red Bins:
Check that red bin should be available on each machine. Also check red marking is done on NG parts lying in the red bin.
6. Material Location & Identification:
All parts ( RM, WIP & FG) should be located separately. There should be no mixing of part. Also check that identification tags should be available on each parts with complete information.
7. Similar Parts Control Mechanism:
All types of similar parts like Left/ Right parts, similar looking parts should be stored in different colored bins, tags, boxes etc. So that no mixing of similar parts should happen.
8. Instrument & Gauge storage:
All the instruments should be stored in boxes & also check gauges are properly stored in racks. Also check Calibration sticker on instruments & validation sticker on gauges.
9. Lux Level Monitoring:
Check lux level in shop floor as per standard. There should be 700 lux level in final inspection area. Also Lux Meter should be available.
10. Daily Machine Check Sheets:
On each machine daily machine check sheet should be available & updated. Also operator should be aware about all points.
11. 4 M Change Board:
4 M change board should be updated & all related records should be updated.
12. Abnormal Situation:
Check that abnormal situations are displayed in shop floor. Also all associates should be aware about the abnormal situations.
13. Rework Area:
Check that separate rework area should available. Rework responsible person should defined & display. Also maintain rework record with traceability.
14. Tools & Fixtures :
All the tools & fixtures should be stored properly in Racks. Also Identification of tools should be done properly with color coding.
15. Bins & Trolley:
Check that Bins & Trolleys condition are OK & all bins / Trolleys should be clean.
Do you know what are the Abnormal Situations in a shop floor ?